Phase 3 · Cultural Integration · Weeks 13–26
Authenticity Indicators
Performance review integration & cultural readiness instrument for EQV Phase 3 implementation
Value Alignment
Transparent Action
Purposeful Growth
How to use this instrument: Component A rates observable authenticity behaviors for performance reviews (20–30% weight per the EQV Phase 3 roadmap). Component B verifies structural integration — whether Phase 3 changes have been implemented vs. nominally adopted. Complete both before the quarterly cultural health review.
A
Authenticity Indicators — Performance Review Rubric
Rate each indicator 1–5 based on observable evidence over the review period. This rubric is designed to represent 20–30% of a performance review score. Evidence must be specific and behavioral — not impressionistic.
Pillar 1 — Value Alignment
Actions reflect stated core values, not just external appearance
Weight: 33%
Pillar 2 — Transparent Action
Interactions and decisions are honest and open, even when uncomfortable
Weight: 33%
Pillar 3 — Purposeful Growth
Growth aligns with authentic potential and values, not only external validation
Weight: 34%
Scoring guidance: 1 = No observable evidence · 2 = Occasional / inconsistent · 3 = Consistent in low-pressure contexts · 4 = Consistent including under pressure · 5 = Demonstrated and modeled for others. A score below 3 on any indicator is a development focus for the next review cycle.
B
Cultural Integration Readiness Checklist
Verify whether Phase 3 structural changes have been implemented vs. nominally adopted. Each item requires status confirmation and, where applicable, documented evidence. A "Complete" status requires observable, verifiable evidence — not intention or announcement.
Phase 3 Roadmap Verification
0 / 8 complete
Measuring Success — Threshold Verification
0 / 7 meeting threshold
Cultural Rituals — Established & Active
0 / 5 active
Integration Notes
Use the space below to document what is working, what is stalling, and what structural change is most needed before the next quarterly review.
What is working
What is stalling
Most important structural change before next review
Score Summary
Click "Calculate Scores" above to generate your summary. Scores update live as you complete each section.
—
/ 100
Complete the assessment above
Rate all indicators in Component A and verify all checklist items in Component B to generate your integration score.